Works are progressing well at our 190 Rye Lane site on behalf of Hexagon Housing Association.

Ground beams are installed & drainage works are in progress.

The tower crane is now on site and we have installed most of the main basement slab.

We are currently shuttering for the lift shaft and perimeter walls.

The final front section of the basement is also being excavated.

The development is due to complete in the summer of 2020.

  • Tower crane installed
  • Main basement slab installed
  • Shuttering lift shaft and perimeter walls