We’ve erected 4 tower cranes across all our projects and here’s one at Frampton in Hackney.  The distinct architectural design of this project has included a number of pre-cast elements including floor slabs and balconies which are being installed now.

We’re currently engaging with  SFS – our Metsec subcontractor  to install the lightweight steel frame which will be followed by a brickwork finish over the coming months.

Completion date is June 2020.